TNE

Airflow management server rack

by:TNE     2020-10-31
Airflow management server rack Server cabinet airflow management mainly refers to the? In fact, we can simply understood as the cabinet cooling. Unit

airflow management flow management unit is mainly used to prevent the air inside the cabinet repeated cycle, improve the efficiency of computer room cooling. Usually divided into passive and active two modes.
1。 Passive airflow management unit
passive airflow management unit usually adopt passive components to change the distribution of airflow. Blind flange, for example, by not using the rack space to promote the normal air flow inside the case, and USES the design of modular, no tools, can be quickly and easily installed on the frame or with square mounting holes in the cabinet.
metal damper used in thread guide, article brush can block air flow at the same time allow cable from frame front to the back rack. Used by lU 8, 2 u, 4 u, u baffle of the airflow control damper suite, by occupying the unused rack space to prevent the air recirculation.
2。 Active air management unit
active airflow management unit usually adopt active device to change the air flow in the cabinet. According to different functions, there are the following.
( 1) Side to side air distribution. The IT facilities with lateral air flow rack device administrator presents many challenges, especially in the area of refrigeration. Because most of the cabinet design into the form of airflow to the former, and want to be in lateral ventilation equipment it's difficult to keep the operating temperature of the ideal. Cabinet side air supply unit considering the better security and composition, it allows the cabinet can placed side by side one by one without stop air flow.
cabinet side air supply unit for 2 u rack installation usually supply products, used in network equipment or lateral air flow between the servers. By adjusting the temperature and humidity of the air from the front of the cabinet to inhale, and sent to the network equipment side air inlet. In this way, extend the service life of the equipment by supply appropriate inlet temperature.
( 2) The back of the air flow management. In high density device environment, traditional way of heat dissipation is usually ineffective. High density installation cabinet may lead to IT equipment overheating, causing downtime. Frame exhaust equipment can be collected from the hot air and returns it to the ventilation pipe, thereby eliminating data 'hot spot in the heart. Through the automatic fan speed regulating mechanism based on the temperature, the fan can automatically adjust the speed in order to achieve the best performance. Through the LCD display equipment installation, the user can view the housing temperature, monitoring, alarm condition and adjust the setting of the equipment. Through the integrated network card can remote monitoring and control frame exhaust devices. The space savings products installed on the back of conform to the requirements of the cabinet, do not take a table space.
( 3) The front of the air flow management. Mounted at the front air distribution equipment is a unique posture to install the fan tray products, its precision air conditioning system with existing in common use for the chassis transfer the equipment of cold air. Air distribution equipment connected to live floor, would be added to the air directly into the chassis, require refrigeration equipment to avoid it to mix with the hot air.
mounted air distribution equipment can eliminate the temperature differences of the chassis at the top and bottom, it can also prevent high temperature exhaust gas recycle from the entrance into the casing.
for battery casing, more than 1 rated load. 5 kw posture air conditioning equipment is suitable, it can maximum in 3. Provide air 0 kw of power. If the underground air conditioning equipment cannot meet the demand of telecommunication equipment near, so also in live using the above additional equipment on the floor.
the national advisory telephone:
Getting doesn't have to be expensive, time-consuming, or difficult. It all comes down to the right method and a laptop charging cart,tablet charging cart,chromebook charging cart,Charging cart in School,36devices charging cart,42U server rack,server cabinet,network cabinet charging cart,charge cart,charging trolley,charging station ,network cabinet,server rack in place.
NINGBO LONGTU NETWORK TECHNOLOGY CO.,LTD. will accomplish this by exceeding the expectations of our customers while conserving resources and preserving the quality of the environment.
If NINGBO LONGTU NETWORK TECHNOLOGY CO.,LTD. added selling plans, offered more charging cart,charge cart,charging trolley,charging station ,network cabinet,server rack, and increased service regions, it would suit the needs of more users.
charging cart,charge cart,charging trolley,charging station ,network cabinet,server rack offers the opportunity for improved manufacturing and product’s data collection, as well as direct feedback, enabling companies to better understand their consumer base and respond accordingly.
Custom message
Chat Online
Chat Online
Chat Online inputting...